Monday, 25 June 2012

Point of Sale Data – Basic Analytics


You've got access to Point of Sale Data…now, what are you going to do with it?

For the purpose of this blog entry, I’m assuming that we have daily aggregated data by product and by store.  We will certainly get measures of sales (both units sold and currency received).  We may also get other useful measures like inventory on-hand, inventory in-transit, store-receipts, mark-downs taken at the store and perhaps some data around warehouse activity too.


[Note: Aggregated data is not as potentially useful to us as individual transaction records but it’s more readily available so we’ll start with that.]

Now, this can be a lotof data (2 years of daily data for 10 measures, 100 products and 2000 stores is almost 1.5 billion data points) - you are not going to handle this in Excel or Access J.  If you forget about daily data and pull weekly aggregations and forget about wanting data by store you can reduce this a lot to a little more than 100,000 data points, BUT,  you have thrown away the opportunity to do much of the more value-added activities I will get to later.

Check out my blog post [Data Handling - the right tool for the job] and then set up your own Demand Signal Repository (DSR).    The DSR is designed to handle these data quantities and should enable standard reporting (as outlined above) straight out of the box. 

Now, you can figure out what you sold last week… or the last 4 weeks, or last 13 weeks, or Year to Date or the same periods for the prior year and I’m sure you will.  Aggregate this data with product hierarchies defined by the Retailer or with your own corporate hierarchies for discussion with your head-office.  You can calculate growth (or decline) and perhaps pricing and distribution.  You can even integrate some of your own corporate data (like shipment details) or externally audited data to combine into reporting.  

All very necessary, but rather basic and a long, long way from the value you could drive from the same data.  If you are looking to POS data to provide you with some real competitive advantage you will have to try a little harder.  The DSR is your cost of entry into this space and provides a solid foundation for deeper analysis, but ownership of a DSR does not, by itself, provide any competitive advantage.   What you do with this tool defines your competitive advantage.  Use it to automate a few reports that you used to pull manually and you saved a few hours a week and nobody, other than you, is going to notice.  You do need to do this but it’s not an end-point it just frees up enough time for you to consider taking bigger steps.

Use your DSR to find opportunities to: reduce off-shelf situations; or drive incremental sales; or reduce cost to supply and you are talking real money.  What is an incremental 1% of sales worth to you?  A lot more than the labor saved in report automation I bet.

In the following series of blog entries, I’ll suggest a few thoughts on more value-added activities.  Now, this will need incremental investment and additional skills but then you didn’t think competitive advantage would be free did you?


All posts in this series



Is the juice worth the squeeze?


I have heard this phrase a lot in recent months in a business context.  It’s so visual, I love it! 

It’s not quite enough though.  It’s pretty simple to understand that every project must be able to pay for itself and deliver a return.  Is the juice worth the squeeze?

It’s also true though that no organization has infinite resources of time or money.  If you have 10 projects that you could do but only enough resources to handle 3, you must prioritize those projects that help you meet your objectives (growth, profitability, market share).  What has the most bang for the buck? 

So with these 2 phrases in mind, it should now be easy…right? (Can you hear the sarcasm)?


In the past, I have been guilty of figuring out something can be done and then wanting to rush ahead to do it.  I have been there, I have done it and I have been surprised when a manager along the way was disinterested in my project or actively trying to shut it down. 

My enthusiasm was high, I had the capability to deliver but my ability to see the bigger picture from a business perspective was lacking.  Perhaps it’s a gap in my formal educational process that focused on business math and statistics rather than finance or managerial common sense?  I’m afraid I am not alone however; many analysts and process improvement folks seem to suffer from the same condition.

I think it’s fair to say that my working experience has largely corrected this: a spell in finance working on investment appraisal helped; running a logistics development team that generated more good ideas than we had capacity to work on helped too.  Being responsible for delivering financial results may have been the clincher. 

Analysts can be blinkered, I admit it, but this inability to see the big picture is not restricted to technical folks.  Managers see the complexity of analytics and have their own knee-jerk reactions.  Some perceive high-risk and immediately, perhaps unconsciously, discount the net benefit they are likely to receive.  In other cases I have seen an almost cult-like view that is without justification and disconnected from the results that could have been predicted  (“do this and good stuff will happen”).

In both cases managers are limited by their inability to estimate cost and/or benefit.  This is where a good analyst can really help. 

Note that for prioritizing most projects we do not need extreme precision in cost or benefit.  Really good projects do not have to scrape a return, the poor ones are usually struggling to hit whatever hurdles your finance team has put in place (e.g. NPV, IRR or payback).  What you need is a reasonable estimation backed up by sound analytics and whatever benchmarks you can lay your hands on.  Let’s take a few examples:

Project A:  Implementing an upgrade to the warehouse management system that converts all current paper-based processes to run on the existing computers. 
·         Based off a time-study, this is likely to save 10 minutes per order
·         The network of distribution centers process approximately 3000 orders per day
·         Cost to implement is estimated at 13 weeks of development time.
·         Warehouse labor costs about $25/worked-hour including all benefits
·         Development labor costs around $100/worked-hour including all benefits

Annual Savings:
10 x 3000 x 365 =  10,950,000 minutes/year
= 182,500 hours / year
= $ 4,562,500  / year         
            One-off Costs:
13 x 40 x 100 =  $52,000 / year
            Summary:
Without calculating NPV or IRR or Payback, I think we can clearly see that this would be a very, very good project.  Focus on the savings per person (forgetting that there are a lot of them and you can easily miss finding this opportunity)


Project B:  Report Automation: in our sales office, our analysts currently spend around 10 hours each, every week, preparing standard reports from Point of Sale (POS) data.  Automating these reports would be very popular, removing a tedious, repetitive part of the work.  Automation of each report takes about 1week of developer time. 
·         We have 10 sales analysts producing 40 reports
·         Sales analysts typically cost about $70/worked-hour including all benefits
·         Development labor costs around $100/worked-hour including all benefits
Annual Savings:
10 x 10 x 52 x 70                =  $364,000
One-off Costs:
40 * 40 * 100                       =  $160,000
             Summary:
Our annual savings do outweigh the costs… or do they?  For the savings to be real we have to stop paying for these hours (the equivalent of 2.5 people) or be able to reinvest them into other work that also generates a return.  Will we?  Frankly report automation is more reasonably justified by eradication of error and consistency of output that makes it easier to manage the thing you are reporting on – perhaps $Billions in sales.

Project C:  Use Point of Sale (POS) data to improve the forecast accuracy of the forecast we build for manufacturing planning.
·         Our current Forecast Accuracy is 75% for 1 month out.
·         We believe that incorporating POS data into the forecasting process could improve forecast accuracy.

(This is where your analyst should help, because you really need a lot more information, knowledge of how inventory buffers uncertainty, a decent model, a pilot and good benchmarks to figure out what this is worth)

A small pilot project using POS data and shipment history from the last 3 years to predict sales for last year suggests we could improve forecast accuracy by 3 – 7 percentage points.
Finished goods inventory is what buffers the manufacturing plant from uncertainty in demand.  With a better forecast you need less safety stock (see [How much inventory do you really need ?] for more details and a handy inventory model).  Using the inventory model:
·         The safety stock portion of our overall inventory is currently 1.8 weeks of supply.
·         A 5 percentage point improvement in forecast accuracy (from 75% to 80%) is worth about 0.4 weeks of supply.
·         From Finance we understand that 1 week of supply is worth approx. $12 million at cost.
·         Our weighted average cost of capital is 12% so projected working capital savings are ~ $1.4 million
·         We may be able to save on storage costs too (assuming they are variable not fixed).  Converting inventory in storage pallet positions we estimate saving about 20,000 pallet positions at a current cost of $5 per pallet per month.
(20,000 x 5 x 12)  = $1.2 million
·         Note: there are no ongoing savings to handling costs as we have reduced inventory not throughput (or sales would have dropped too).  A one-off saving in handling while inventory levels fall could be included but would be relatively immaterial.

Our pilot project has also helped us understand exactly how we can enhance the forecasting process with POS data and allowed us to cost the necessary changes to the forecasting system at approx. $1 million in one-off cost.   So we end up as follows:
Annual Savings:
$1.4 million in cost of working capital
$1.2 million in variable storage costs
One-off Costs:
$1 million
Summary:
This juice is (probably) worth the squeeze.  With a payback around 2.5 years it should be on our list of viable candidates.  Remember that the pilot said that accuracy improvement was in a range of 3 to 7 percentage points.  We evaluated the average here. At 3 points the costs will stay the same, the savings would only be 60% (not so good).
Does it give the best bang for the buck?  Well we will have to line it up against all other projects competing for our resources to know that.  My guess… probably not.
By the way, the inventory modeling exercise also said that you have 0.5 weeks of unnecessary inventory in the system.  Perhaps it would be better to start by trying to eradicate that.

The bottom line for you is that you should consider using this sort of Analytical Estimation in deciding which of your projects make the cut.  A good estimate is a lot better than a bad guess.

BTW - from recent experience, I can confirm that beetroot juice is most definitely not worth the squeeze J

How much inventory do you really need?

If you are following lean methodologies you will have encountered the concept of inventory as waste.   It’s something you have because you cannot instantly manufacture and deliver your product to a shopper when they want it, but not something that the shopper sees any value in.

I find that a very interesting idea as it challenges the reasons that you need inventory, and that’s definitely worthwhile.   However, many of these causes of inventory need more substantial changes in your supply chain (additional production capacity, shorter set-up times, multiple production locations) so as a first step, I suggest that you figure out what inventory your supply chain really needs and why.  Take out the truly wasted, unnecessary stock and then see what structural changes make sense.

Typically you can remove at least 10% of inventory while improving product availability. What’s that worth to you?  If that sounds a little aggressive, I can only say “been there, done that, got the coffee-mug”. (We didn’t do t-shirts).



I’m going to look at this from a manufacturer’s perspective and try to visualize for you why they need inventory and how to quantify the separate components.  Why does a manufacturer have inventory?  Let’s start with an easy one:

Cycle Stock is related to how often you add new inventory to the system.  Manufacturing lines typically make a number of different products, cycling through them on a reasonably consistent schedule.  “We make the blue-widgets around once a month”.  It may not be exactly a month apart and that’s not really important to us.  Once a month, in this case, a batch of blue widgets is made and added to inventory.  Over the course of the next month (or so) that inventory is consumed and inventory drops until we make another batch.  Over the course of 12 months it would look something like the example below.


Cycle Stock across time


Hopefully it’s not too hard to see that while “Cycle Stock” varies from 0 to about 30 days worth of demand, it will average out to about half-way between the peak and trough – roughly 15 days.  If you manufacture your product less frequently, say once every 2 months, Cycle Stock will peak at 60 days of demand and, on average, adds 30 days of inventory to your overall stock position.  If you manufacture your product once a week, Cycle Stock will peak at 7 days of demand and, on average, adds 3.5 days of inventory to your overall stock position.

If you want to reduce Cycle Stock you need to make your product more often.  That probably means reducing the time and lost production associated with line change-overs so changing more frequently is less painful.

Pipeline stock is slightly harder to explain but really easy to calculate.  Pipeline stock is inventory in your possession that is not available for immediate sale.  Good examples would be inventory that is in-transit, or awaiting release from quality testing: you own it but you can’t sell it yet.  Let’s say that from the point of manufacture it takes 3 days to move the product to your warehouse where it can be combined with other products to fulfill customer orders.  This has the effect of increasing your inventory by exactly … 3 days.  It really is that simple.  If you know how long inventory is yours but unavailable to meet demand, you know your Pipeline Stock.

If you want to reduce pipeline stock you need to reduce testing time post production, get your product to market faster even consider adding production capability nearer to your markets to reduce transportation time.

Inventory Build.  This is easy to describe but very difficult to model.   For products with large variations in sales volume across time (typically but not always due to seasonality) there may not be enough production capacity to manufacture everything you need just prior to the demand.    As long as the product can be stock-piled, the manufacturer just makes it earlier and holds it until its ready for sale.  If you want an example, think of Halloween Candy, it hasn’t really just been made in early October. 

So why is it so hard to calculate?  Well inventory models are typically built one product at a time but to know your production capacity availability you need to look at all products using shared resources and production-lines simultaneously and build a production plan that understands all your constraints and your planning policies.  Essentially, you need to build an entire (workable) production plan and that’s typically beyond the scope of an inventory modeling exercise.  Often the best place to get this is from your production planner.

If you want to reduce Inventory Build you may be able to do so by more effective production-planning , (Optimization models may be able to help here).  Alternatively you will need to add production capacity.

Safety Stock is the most complex part of the calculation but thankfully the math is not new and you can buy tools that do this for you.  You can’t make whatever you want whenever you want it (or you have little need for any inventory).  If I was to tell you now that we need another batch of “Red Doodas” it’s going to take some time to organize that.  Apart from purchasing raw and packaging materials you may need to break into the production schedule, reorganize line labor perhaps even organize overtime shifts.  You may say that you could that done in about 7 days by expediting, but you probably do not want to plan on having to expedite very much of your production.  So, think of something more reasonable, an estimate not too conservative but one that you could stick to most of the time…21 days ?  Let’s work with that and call it the “Replenishment Lead Time”.

Now, I want to set my safety stock so that it buffers me from most of the uncertainty I could encounter during the Replenishment Lead Time.  It seems highly unlikely that I will sell exactly what was forecast in the next 21 days.  If I sell less I am safe if unhappy.  If I sell more I need a little extra stock to help cover that possibility.  Similarly, even though I asked for 1000 “Red Doodas”, production does not always deliver what I asked for and sometimes it takes a little longer than it should too.  By measuring (or estimating) each of these sources of uncertainty and then combining them together we can get a picture of the total uncertainty you will face over the replenishment lead-time.  If we also know what level of uncertainty you want the safety stock to cover  we can calculate a safety stock level.

Typically the amount of uncertainty you wish it to cover is expressed in terms of the % of total demand that would be covered.  So, 99% means that safety stock would target fulfilling 99% of all product ordered.  The other 1% would, sadly, be lost  to back-orders; or future orders; or possibly lost completely.    As CPG case-fill rates (as measure of the proportion of cases fulfilled as ordered) are typically closer to 98%, 99% is actually rather high.

[Note: Don’t go asking for the safety stock to cover 100% of all uncertainty as this (theoretically at least) requires an infinite amount of safety stock]

Here’s our previous example with some additional variation (uncertainty) added in demand.  Safety stock has been set so that you should meet 99% of all demand from stock and production kicks off when we project inventory will drop below the safety stock level 30 days ahead.


Cycle and  Safety Stock across time

If there was no uncertainty the inventory would have a low point at exactly the safety stock level with production immediately afterwards.  Clearly actual sales did not turn out exactly as forecast.  Sometimes we sell less (and inventory is a little high when production kicks in).  Sometimes we sell more and sales start to use up the safety stock.

The safety stock level is intended to buffer most of this uncertainty, but as you can see, inventory does occasionally drop to 0 and (for very short periods of time) you would not have enough inventory to meet all orders.  On the days when this happens you will short a lot more than more than 1% of the ordered quantity but over time this would average out to about 1%.

If you want to reduce Safety Stock you have a few options.  Remember that they key inputs are:
·         Replenishment Lead-Time
·         Demand Uncertainty
·         Supply Uncertainty
·         % of uncertainty you want to cover.
If you can reduce any of these, your safety stock will come down.
I've embedded a simple inventory model below that you can use to experiment with the various inputs that drive your need for inventory.

Once you have set up the inputs appropriately for your business take a look at what a change to any of these inputs would do for total inventory.  What if you can:
·         improve Forecast Accuracy by 5 points;
·         reduce Replenishment Lead-Time by 1 week;
·         reduce you Cycle Time by 50%;
·         reduce Pipeline Length by 25% ?

  

Notes
Uncertainty of demand is typically measured by “forecast accuracy”.   There are some variations on the calculation of forecast accuracy but here I am using it as (1 – [Mean Absolute Percentage Error]) measured in monthly buckets.   [Mean Absolute Percentage Error] may seem a little scary, but it actually does exactly what it says, it’s the average, absolute error as a % of the forecast. (Absolute errors treat negative values as positive)


Forecast accuracy is typically measure in fixed periods that are relevant to you.  These may be close to but typically not the same as your Replenishment Lead-Time, so the model will try to estimate the value it needs from the standard metric.


If you are not already measuring your own forecast accuracy, you really do need to start.  A forecast with no sense of how accurate it is, is (relatively) useless.


Disclaimer:  This tool is a reasonable guide  and should give you a good sense of what is driving your need for inventory and what you might do to reduce it.  Ultimately though, its limited by the complexity I wanted to include in the Excel model it’s based off and of course it can only handle one product at a time.   Don't use it to build your inventory policies - invest in the real thing.

Saturday, 23 June 2012

Activity-Based Costing Vs Traditional Absorption Costing (Critical Review)

By Jackie, Researcher
Topic: Education
Area of discussion: Cost & Management Accounting

The objectives of this research are to find out which method is considered the best method to allocate indirect costs (i.e to generate relevant cost information for decision making purposes), the correct ways on how to calculate it (steps by steps guide is given below plus an additional real question taken from LCCI as an extra revision purposes), to explain what are the differences between activity-based costing and traditional absorption costing system and how to use a “quick check” method of which I designed myself (to check whether the computed answers are correct or not?).

Introduction
Generally, both methods are used to calculate the cost of production. There are no differences between these two methods in finding material costs and labour costs. Their major concern is how to allocate the overhead costs to the cost of production. Ideally, using Activity-Based Costing is better than Traditional Absorption Costing as it is more accurate, reasonable and appropriate. This is because Activity Based Costing system uses both volume-based and non-volume-based cost drivers, while Traditional Absorption Costing system uses only volume-based cost drivers. Examples of volume-based cost drivers include: units of output, direct labour hours and machine hours while examples of non-volume-based cost drivers include:  numbers of production inspection, number of machine set-up, number of stock requisition and etc.

Let’s take a look at this example:




Based on the question above, single-stage traditional absorption costing system applies, whereby we need to total up all the overheads cost and then divide it by the total level of activity.  For this question the level of activity will be the total number of machine hours. After dividing it, we will get the overheads cost per one unit of activity (i.e. production overhead absorption rate). Then, the final step is to allocate this rate to the products by multiplying it with the number of machine hours used by a particular product. See below.




For Activity-Based Costing, since the separate cost activities are already given, then we only need to divide the cost of each activity with their respective cost drivers in order to find the activity rates. Cost driver is the factor that causes a change in an activity cost. For example: number of inspections and number of set ups. See below.




Then, the final step is to allocate those rates to products by multiplying them with the amount of cost drivers which will be used by them. For example, if product Alpha requires 20 inspections, then, 20 inspections x £800/inspection = £ 16,000 will be allocated to product Alpha. In order to find the product inspection overhead per unit, we have to further divide the amount by the Alpha’s total production output (units) which is 500 units. Then, £32 will be allocated to each unit of Alpha. Same method of calculation applies for the rest. See below.




A “quick check” method:
Although the cost of production per unit for each product is different in Traditional Absorption Costing and Activity-Based Costing, both methods will have the same total cost of production and because of this we can use this “quick check” method to check the answers.




References, additional readings and related links:

Gain an understanding of the basic concept of activity based costing

The basic concept of activity based costing

Activity Based Costing versus Traditional Costing

Activity Based Costing with worked example to compare with Traditional Costing

Saturday, 16 June 2012

Unemployment in Malaysia [Updated, June 2012]


By Jackie, Researcher
Topic: Society (employability)

The objectives of this research are to find out the latest unemployment rate in Malaysia,to determine which is the worst affected sector, the reasons behind all these problems, suggestions to tackle those problems, discussion on the effectiveness of certain government’s plans and actions to cope with these problems so far, the employers' views regarding this issue and what should the fresh graduates do to secure a better job in the future.


Research Essay
INTI International College Subang

            Normally unemployment rate in developed countries is higher than developing countries due to higher competition. For example, in the last three quarters of 2011, United Kingdom’s unemployment rate has rose from 7.8% to 7.9% and followed by 8.3% respectively. At the same time, Malaysia’s unemployment rate has went up from 3% to 3.2% and followed by 3.3%, and was ranked at 170th place (see note 1) out of 198 countries based on their degree of severity (The Human Resource Ministry of Malaysia and CIA World Factbook, 2012). Observation reveals that youth unemployment rate (see note 2) is even greater than the overall unemployment rate for both of the countries suggesting that youngsters are facing more difficulties in finding jobs as compared to adults. In Malaysia, one of the badly affected sector is the nursing field (see note 3) whereby in 2010, more than 54% of the private nursing graduates were unemployed three to four months after graduating, compared to only 21.7% in 2008 (The Star, 2012). It is a worry situation as fresh graduates find themselves difficult to get employed despite having a solid academic qualification.


Comparison of Malaysia unemployment rate with United Kingdom unemployment rate in 2011.

                 Firstly, graduates lack of working experience and generic competencies. For instance, “jobless nurse” which is the most popular unemployment topic in Malaysia recently, Khoo and Liow (2012) agree that this is due to minimal qualification and zero practical training experience (see note 4). Ideally, organisationsprefer to hire people with relevant experience as they can spend lesser time and money to train them (Chong, 2005). Meanwhile, in a survey conducted by Ranjit (2005), 258 Malaysian private sector managers have identified certain soft skills which were lacking in Malaysian graduates such as planning, organizing, problem-solving, decision-making, leadership, creativity, critical thinking, conceptual and networking skills. According to his observation of job advertisements in two leading English newspapers in 2004, he found that the generic skills which are most sought-after by employers are interpersonal skills, oral and written communication, leadership skills, teamwork, problem-solving, creativity and computer literacy. As a solution, Malaysian government has allocated RM10.5 million to launch Graduate Employability Programme (GEP) in 2010 to enhance the skills and competencies of unemployed graduates. 


Generic competencies which are most sought-after by employers

                Secondly, poor command of English. In 2009, JobStreet.com has conducted an English Language Assessment (ELA) test whereby it had ranked Singaporeans first, Filipino second and Malaysians third. This has proven that Malaysian command of English is not up to standard. The survey revealed that 65% of employers have turned down job seekers due to poor command of English, which is the official business language for 91% of Malaysian companies. Chook (2009) states that ‘Proficiency in English influences one’s ability to communicate effectively, and to articulate ideas and solutions well. It also affects self-confidence, the ability to work in team and excel.’ As a solution, in 2003, English was readopted as the medium of instruction for Science and Mathematics in primary and secondary school but sadly, in 2009 government has made decision to revert back to Bahasa Malaysia starting from 2012 onwards, claiming that the step is ineffective as only 19.2% of secondary teachers and 9.96% of primary teachers were sufficiently proficient in English. Fortunately, 89 American educators were invited to teach English in Terengganu under English Teaching Assistantship (ETA) programme since 2009. This programme received positive outcome and therefore, ETA has been spreaded to Pahang and Johor while Education Ministry look forward to hire teachers from Britain and Australia also (The Star, 2012).

              Thirdly, graduates lack of positive attributes. In October 2011,JobStreet.com’s survey taken by 571 human resource practitioners reveals that unrealistically high salary or benefits demand is the top reason why fresh graduates were not hired. According to Siti (2011), many candidates were caught unprepared during interview and she elaborates further that ‘They attend interview without even basic knowledge about their potential employers. It makes a very bad first impression.’ In addition, some of the poor attitudes from the employers’ point of view are choosy about jobs, unwilling to learn, reluctant to serve beyond their own comfort zone, job-hopping (see note 5) and lack of self-confidence (see note 6) in finding a job.


Comparison of the expected salary with the actual salary received for the diploma and degree holders in 2011.

                Fourthly, there is a mismatch between the type of graduation degree and the requirements for the available jobs in the labour market. Naroden (2010) highlights that colleges and universities should provide their students with proper career guidance and information, ensure that their syllabus were relevant to the current industrial needs as well as conduct researches on the market needs to prevent students from taking irrelevant courses. It is better if they could identify the job available in the market before they start the students enrolment. Jeyakumar (2012) has pin point this situation where a freeze was made on the intake of new students in private institution until existing graduates secure jobs as the need for new nurses is only about 1,500 a year in private sector but on average 12,000 students will graduate annually.

                In addition, some external factors give negative impacts towards employment. For instance, the retirement age (see note 7) of private sector has raised from 55 to 60, with an option of four-year extension while for civil servants, it has raised from 55 to 58 (Manimaran, 2011). This will eventually diminish the needs for new recruitment to replace the senior employees. Besides, the extension of maternity leave (see note 8) from 60 days to 90 days seems unfavourable to some employers. They voice out that this will affect work operations and productivity whereby they have to find other people to replace their jobs temporarily, and have to pay additional costs for extra 30 days maternity leave. This may cripple business and cause losses (Indramalar, 2010).

                  In conclusion, fresh graduates must keep upgrading themselves from time to time with a mixture set of skills and lower down their expectation as well as change their negative attitude as competition is becoming stiffer plus the existing of external factors.  

Funny cartoon      
                                                              
Footnotes:
1.Unemployment rate (%) comparison and ranking between countries.
2.Youth unemployment rate in United Kingdom and Malaysia.
3.The Star Newspaper (3th February 2012), “Nursing job woes cut deep”.
4.The Star Newspaper (8th February 2012), “Attitude the biggest hindrance”; also please take note that   
   ‘Khoo’ is referring to Jeannie Khoo, Kelly Services marketing director for Singapore and Malaysia while 
   ‘Liow’ is referring to Malaysia’s Health Minister Datuk Seri Liow Tiong Lai.
5.The Star Newspaper (10th February 2012), “Youths with an attitude”: 12% of workers job-hop every year  
    especially in lower-rank jobs in factories, restaurants or hotels. The Star Newspaper (19thFebruary 2012),  
    “Costly job hopping”: Employers had to spend an average RM25,000 to RM30,000 to replace each   
     employee who quit.
6. JobStreet.com Employee Confidence Index, a measure of a jobseeker’s confidence in finding a job.
7.The Malaysian Insider (26thSeptember 2011), “Private sector retirement age to go up”.
8.The Star Newspaper (12th July 2010), “Demands of motherhood”.

Friday, 1 June 2012

Share Repurchase Theory/ Stock Buyback Theory (Critical Review)


By Jackie, Researcher
Topic: Education
Area of discussion: Finance
Chapter: Dividend policy
Subchapter: Alternatives to cash dividends - Share repurchases

The objectives of this research are to find out is there any effects on the stock price when a company purchases its own shares, what are the effects of stock buyback on certain financial ratios, and what are the reasons or motives for share repurchases. By the way, this topic is very popular as questions are often set out from this chapter in finance examination. Therefore, it is good to actually understand and gain some knowledge about the basic concept of share repurchases although we might not be playing shares in real-life.

Introduction
Share repurchase is a programme by which a company buybacks its own shares in the open market. Ideally, there are three general ways of doing it: tender offer (shareholders are invited to offer their shares to be sold back at the price set by the company), stock market purchase (repurchases of own stock in the open market at current market prices), and agency buy back/ arrangement (brokers are employed as agents to organize the repurchases of its shares from institutional shareholders).

Let’s look at this example: 


If INTI Corp Bhd uses RM15 million of its cash to repurchase its shares at RM5.00 per share, what is the new return on assets (ROA), earnings per share (EPS) and price per share?

Solution (Effects):

Cash = RM20 million – RM15 million = RM5 million

Total assets = RM50 million – RM15 million = RM35 million

Total number of shares repurchased = RM15million ÷ RM5 per share = 3 million shares

No of ordinary shares outstanding = 10million shares – 3million shares = 7million shares

New return on assets (ROA)
= (Earnings ÷ Total assets) x 100%
= (RM2 million ÷ RM35 million) x 100%
= 5.71%

New earnings per share (EPS)
= Earnings ÷ No of ordinary shares outstanding
= RM2 million ÷ 7 million shares
= RM0.29 per share

New price per share
= (Total assets – Cash spent on repurchasing) ÷ No of ordinary shares outstanding
= (RM50 million – RM15 million) ÷ 7 million shares
= RM5.00 per share



Critical explanation:
Is it 100% confirm that, ROA and EPS will rise when a company purchased its own shares?
Theoretically and practically, yes! This is because both ROA and EPS’s numerators (the number on the top of a fraction) i.e. earnings remain unchanged in stock repurchase. However, their denominators (the number on the bottom of a fraction) decrease where total assets decreased due to cash used in repurchasing (in ROA) and total number of ordinary shares declined due to stock buybacks (in EPS). Therefore, when the numerator remains while the denominator declined, the two financial ratios (ROA and EPS) will obviously increase.

Is there any effect of stock buyback on the share price?
Nope. Remember, finance theory already mentioned clearly: “Repurchases do not change stock price”. Although, based on my researches there are actually different arguments exist in this theory due to its theory’s limitations and assumptions. That’s why at the beginning of this example when I created this question, I clearly put there INTI Corp Bhd purchases its own shares at RM5.00 per share which is its market price in the open market. In short, repurchases at market price will not affect stock price. However, stock price will be affected if a company repurchases its shares at apremium (a price higher than the market) or at a discount (a price lower than the market).


The motives of share repurchase (or stock buyback)
  • To improve financial ratios by reducing the number of shares outstanding. Buybacks reduce the assets on the balance sheet (cash was used in buybacks), and thus increases the return on assets (ROA) while earnings per share (EPS) increases as the numbers of shares outstanding decreases after the buyback.
  • To avoid or eliminate excessive dilution which has the opposite effect of repurchase as it weakens the financial ratios of the company by increasing the number of shares outstanding.
  • To avoid or reducing the likelihood from becoming takeover targets/ to ward off any sort of hostile activity.

Important:
Some of the past year examination question related to this topic, directly extracted from my college past year exam paper. The sample answer was provided by the examiner. Ideally, this ‘share repurchases’ question is quite famous in examination as it can easily be tested in two ways: theory and calculation. Somehow, I have seen some question which requires students to compare the advantages and disadvantages of stock buyback with other alternatives to cash dividends such as stock dividends and stock splits.


Notes:
This sharing is not considered as leaking of information, but to increase the diffusion of finance knowledge. Hopefully, this information will be helpful to some students especially for those who are currently taking finance examination.

Related links, additional readings and references:


Stock Market Tips & Facts: What is the stock buyback theory?

Stock Market : How Do Stock Buybacks Work?

Don’t trust stock buybacks:

The best way for companies to avoid becoming takeover targets is to engage in regular stock buy-backs on the open market.

Stock markets: The buy-back delusion, The Economist

Sunday, 27 May 2012

Stock valuation: Two-stage Dividend Growth Model (Critical Review)


By Jackie, Researcher
Topic: Education
Area of discussion: Finance
Chapter: Valuation of Assets and Company (Stock valuation model)



The objective of this week’s research is to compare which method is more accurate, faster and consumes lesser time by comparing the table method and the formula method to calculate the two-stage dividend growth model. Step by step tutorial is provided below with clear explanation and workings.



Introduction
Ideally, many companies will usually experience above normal growth rates for a short period of time before settling in on a lower but stable perpetual growth rate. Thus, it would be inappropriate to calculate the stock’s intrinsic value based on the single-stage dividend growth model. Unlike single-stage dividend growth model, the two-stage dividend growth model formula is often not provided in exam.



Sample question
Compute the value of a share of common stock of a company whose most recent dividend was $2.50 and is expected to grow at 3 percent per year for the next 5 years, after which the dividend growth rate will increase to 6 percent per year indefinitely. Assume 10 percent required rate of return.






Therefore, by using the formula method, we can actually save a lot of time (especially during examinations as the time is limited). Besides, it is also more accurate as it minimizes the rounding effect as compared to the table method. Moreover, we can compute it much faster as we do not need to refer to Future Value Interest Factor (FVIF) table as well as Present Value Interest Factor (PVIF) table.


The table is available here for
Future Value Interest Factor (FVIF): http://arjun.net.np/calculators/fvif_table.php
Present Value Interest Factor (PVIF): http://arjun.net.np/calculators/pvif_table.php?beg=0


Notes:
The question above is extracted from Principles of Corporate II – FIN326, Session: May 2010, Tutorial 3 at Mr.Lim’s class in INTI College Subang Jaya, Malaysia.


Related links and additional readings:


Dividend growth models

Why a stock valuation process is important in Dividend Growth Model?

Dividend discount model – stock valuation – formula – how to calculate –Subjectmoney.com